Please select and order
€185.23
excl. VAT
CONFIGURE NOW
Norm

ÖNORM EN 16907-3

Issue date: 2019 03 15

Earthworks - Part 3: Construction procedures

This European Standard provides execution procedures for excavating, transporting and placing soils and rocks for the construction of earth-structures and guidance for th...
Read more
Valid
Publisher:
Austrian Standards International
Format:
Digital | 96 Pages
Language:
German | English | Download GER/ENG
Optionally co-design standards:
This European Standard provides execution procedures for excavating, transporting and placing soils and rocks for the construction of earth-structures and guidance for the work. Additionally, it includes excavation and placement of rock materials underwater. Dredging of soils and the associated hydraulic placement of fills are covered by EN 16907-6 and EN 16907-7. Execution of earthworks follows the conclusions of the earthworks design and optimization phase (EN 16907-1), which should anticipate soil and rock specificities and their suitability. In case some events could not be foreseen, additional design is performed during the execution of works.
ÖNORM EN 16907-3
2019 03 15
Earthworks - Part 3: Construction procedures
Norm