Please select and order
€134.80
excl. VAT
CONFIGURE NOW
Norm

ÖNORM EN 1538

Issue date: 2000 07 01

Execution of special geotechnical works - Diaphragm walls

This European Standard specifies the execution of diaphragm walls and the practical aspects which must be taken into account in the production of the working drawings. Di...
Read more
Withdrawn : 2010 11 15
Publisher:
Austrian Standards International
Format:
Digital | 54 Pages
Language:
German | English
Currently valid:
Optionally co-design standards:
This European Standard specifies the execution of diaphragm walls and the practical aspects which must be taken into account in the production of the working drawings. Diaphragm walls can be permanent or temporary structures. The following types are concerned : a) retaining walls : usually made to support the sides of an excavation in the ground. They include : 1) cast in situ concrete diaphragm walls ; 2) precast concrete diaphragm walls ; 3) reinforced slurry walls ; b) cut-off diaphragm walls : usually made to prevent migration of groundwater, clear or polluted, or of other liquids present in the ground. They include : 1) slurry walls (possibly with membranes or sheetpiles) ; 2) plastic concrete walls. The design, planning and execution of diaphragm walls call for experience and knowledge in this specialized field. The execution phase requires skilled and qualified personnel and this document cannot replace the know-how of specialist personnel and the expertise of experienced contractors.
ÖNORM EN 1538
2015 12 01
Execution of special geotechnical works - Diaphragm walls
Norm
ÖNORM EN 1538
2010 11 15
Execution of special geotechnical work - Diaphragm walls
Norm
ÖNORM EN 1538
2000 07 01
Execution of special geotechnical works - Diaphragm walls
Norm
ÖNORM B 4450
1974 10 01
Earthwork and foundation engineering; slurry trench walls
Norm
Historie aufklappen
Norm
ÖNORM EN 10080
Issue date : 2005 09 01
Steel for the reinforcement of concrete - Weldable reinforcing steel - General
Norm
ÖNORM EN 1538
Issue date : 2010 11 15
Execution of special geotechnical work - Diaphragm walls